
Guia do comprador pela primeira vez

- Difficulty in matching equipment selection with technical parameters
- Complexity of operation and difficulty of process debugging
- Melt temperature setting deviation, improper cooling system adjustment, neglect of equipment maintenance.
- Concerns about equipment stability and productivity
- Doubts about the response speed of equipment failure and the supply of spare parts.
The ultimate program for the first purchase
From “Blind Purchasing” to “Precise Matching”
In-depth diagnosis of needs:
Online questionnaire pre-assessment: customers fill in the film use (e.g. food packaging, agricultural film), raw material type (PE/PP/PVC), output demand (kg/h), etc., and generate a preliminary model recommendation report.
Engineer 1V1 docking: Arrange professional engineers to inspect the customer’s production environment, analyze the existing supporting facilities (such as power capacity, plant space), to avoid the risk of “false parameter”.
Adaptation program output:
Parameter comparison table: Clearly list the existing demand and equipment performance (e.g. “blowing ratio 2.5:1 → suitable for 30μm thick agricultural film”).
Trial Verification: Provide raw material trial production service to verify the stability of the equipment and the finished film to meet the standard rate.
From “novice anxiety” to “skillful control”.
Step-by-step training system:
| Phase | Form | Content | Deliverables |
| Pre-phase | Video course (Chinese/English) | Safety regulations, basic operation procedures | Online examination and certification |
| Installation period | On-site practical instruction (2 days) | Die head assembly, initial parameter setting | “Equipment Commissioning Manual” |
| Commissioning period | Remote assistance (3 months) | Process optimization, fault emergency response | Monthly operation score report |
Intelligent assistance tools:
AR Troubleshooting: Scanning the QR code of the equipment through cell phone, superimposed with virtual arrows to indicate common problematic parts (e.g. abnormal tips in the heating zone).
Process Parameter Library: Built-in 100+ film production formulas (e.g. high transparent PE film parameter set), one-click call and fine-tuning.
AI film thickness control system:
- Real-time monitoring of the diameter and thickness of the film bubble, automatically adjust the cooling air volume of the wind ring (± 5μm precision).
- Abnormal warning: automatically identify defects such as “sharkskin” and “crystal spots”, and trigger shutdown protection.
- Adaptive winding deviation correction: Adopting laser sensing + servo motor, realizing coil alignment precision ≤0.2mm (50% higher efficiency than manual operation).
- Energy consumption optimization Kanban: Digital twin interface displays real-time power consumption (kW-h/kg), compares with industry benchmark values, and recommends energy-saving parameter combinations.
- Data-driven operation and maintenance: Interconnected Equipment (IoT): Remote monitoring of key component life (e.g. screw wear) via the Chaoxin cloud platform, with replacement parts sent in advance.
Full-guarantee after-sales service: from “passive maintenance” to “active escort”.
Service commitment standardization:
- Time guarantee: 48 hours fault response (domestic), 72 hours international (provide standby machine priority use).
- Inventory of perishable parts: 5 warehousing centers in China (Shanghai, Guangzhou, Wuhan, etc.) to ensure delivery within 24 hours.
- Warranty Upgrade: Basic warranty 12 months → Extendable to 36 months (exclusive for customers who sign annual maintenance agreement).
- Capacity Betting Agreement: If the actual production of the equipment is lower than 95% of the contracted value, the energy cost corresponding to the difference in production will be borne by Chaoxin.
- Replacement subsidy for old machine: when the first purchase customer upgrades the equipment in the future, he/she can enjoy the replacement credit of the appraised value of the old machine +15%.
From “hidden waste” to “transparent cost reduction”.
Raw material waste control:
- Consumables package for commissioning period: provide the first batch of raw materials for trial machine and equipped with recycling granulator rental service (cost reduction of 30%).
- Energy consumption optimization program: Green energy-saving certified models: more than 25% power saving compared to traditional equipment (through IE3 motor + waste heat recovery system), provide government subsidy application assistance.
Customer Journey Map:
→Pain Point Contact Period
→ Solution Customization Period
→ Training Delivery Period
→ Steady Production Operation and Maintenance Period
Quantitative KPIs:
- Customer’s first production compliance time ≤45 days
- Reduce the operation error rate to <5% after training.
- Closed loop rate of after-sales complaints ≥98
Receber a confiança de Clientes globais



histórias-1

histórias-3

histórias-7

histórias-4

histórias-9

histórias-8

histórias-5

histórias-6


